South Branch Lining Project
Currently, the South Branch Phase I, Reach 2 & 3 projects consists of earthwork, drainage, and installation of geomembrane covered with concrete lining, for increased water conservation and operational improvements to the KRD system. The entire South Branch Phase I is approximately 2.9 miles from Robinson Creek up to the Swede Tunnel outlet. The Project has been divided into 5 distinct Reaches with Rach  lining having been completed. 