North Branch Lining Project

This project consists of earthwork, drainage, and installation o f geomembrane covered with concrete lining, for an increased water conservation and operational improvements to the KRD system. The North Branch Canal Project is approximately 0.4 miles from the outlet of Siphon No. 6 to the Inlet of Tunnel No. 5. (see map in pictures)

©2020 by Kittitas Reclamation District. Proudly created with Wix.com

NB phase 1 (Belsaas)